0

NSB Stadler Flirt sporet av under testkjøring

OPPDATERT | UPDATED | AKTUALISIERT | 17 FEB

NSB FLIRT | ZUG WÄHREND DES TESTLAUFS ENTGLEIST | DERAILMENT DURING TEST RUN | AVSPORING UNDER TESTKJØRING | Foto: AC.Schjoll

NSB LOKOMOTIVET TYPE 74

 
Foto: AC.Schjøll

En nettside om modelljernbane og modelltog

NSB FLIRT | ZUG WÄHREND DES TESTLAUFS ENTGLEIST | DERAILMENT DURING TEST RUN | AVSPORING UNDER TESTKJØRING | Foto: S.Kalberg

HELE TOGET HAR FÅTT STORE SKADER I ULYKKEN

 
Foto: S.Kalberg

Märklin, Roco, Fleischmann og H0 hobby

NSB FLIRT | ZUG WÄHREND DES TESTLAUFS ENTGLEIST | DERAILMENT DURING TEST RUN | AVSPORING UNDER TESTKJØRING | Foto: P.Gjersoe

KRAFTIG SAMMENSTØT MED FJELLET

 
Foto: P.Gjersøe

jernbane, tog, modellbil, modellbiler

VIDEO | NRK.NO

 
 

NSBs nye togsett type 74, også kalt supertoget flirt, sporet av under testkjøring ved Horten på Vestfoldbanen i dag tidlig, 15 februar. Den ene vognen veltet under avsporingen. Der var et sted mellom 10 og 15 ombord i toget, hvorav en ble kastet ut av frontruten og er alvorlig skadet. Fire andre er på vei til sykehus. Total oversikt over skadeomfanget er foreløpig ukjent.

Det var Jernbaneverket som først meldte om togavsporingen som skjedde like ved den gamle stasjonen på Nykirke. Toget var på vei fra Larvik mot Drammen og skal ha holdt rundt 100 km/t da ulykken inntraff. Deler av togsettet traff fjellveggen da det sporet av. Tre ombord var ansatt i NSB, de andre i et eksternt selskap. Togene er tidligere testet på Bergensbanen.

NSB sine nye Stadler Flirt skal etter planen settes inn i normal persontrafikk om to uker, og skulle gå fast på selve skadestrekningen. Toget sporet av i en slakk kurve, men årsaken er ennå ikke kjent. En må samtidig få påpeke at de samme togsettene, produsert av sveitsiske Stadler Rail, kjører i daglig trafikk flere steder i Europa uten å ha vært utfor lignende uhell.

Et større område er sperret av, også for presse, grunnet fare for at kjøreledning skal falle ned. Ifølge NRK er der et ambulansehelikopter, et redningshelikopter, seks ambulanser, tre brannbiler og flere politibiler på stedet. Ifølge NSBs kommunikasjonsrådgiver er det nå klart at all kjøring med disse togene er stanset inntil ulykkesårsaken er kjent. Mer info kommer.

16 FEB | Ingen av de fem ombord, tre nordmenn, en fra Finland, og en fra Sveits, ble alvorlig skadet. Aftenposten legger frem kritiske fakta; Togledersentral i Drammen fikk beskjed om avsporing med personkskade kl10:30. Pendlere fikk info-SMS fra NSB om at banen var stengt kl10:43. HRS, hovedredningssentralen for Sør-Norge, ble varslet først kl10:52.

Der var ferdskriver og videokameraer ombord. De gåes nå igjennom for å finne årsaken. Jernbaneverket sier i en pressemelding at det ble varslet umiddelbart etter avsporing var bekreftet (mrk. lokfører ble kastet ut). Det har kommet frem at lokomotivet gjørte rett frem i en kurve, hvorpå det fraff fjellveggen. Hvorfor er ennå uklart, men hastighet kan være en årsak.

17 FEB | Statens havarikommisjon for transport (SHT) har kommet med en rapport om ulykken. Opplysningene fra togets ferdskriver og kamera viser at toget holdt en hastighet på rundt 135 kilometer i timen, i en 70-sone, da bremsene ble koblet inn. Avsporingen skjedde ca 50–60 meter etter at strekningshastigheten går ned fra 130 til 70 kilometer i timen.

Det er svært skarpe kurver i området, og toget hadde 1200 meter å bremse på. Den pålagte hastighetsnedgangen er markert med skilting. Analysene tyder på at det tok 11 sekunder fra bremsene ble aktivert og til toget stoppet opp. Den tilbakelagte distansen er målt til 340 meter. Videre undersøkelser vil bli gjort for å finne sammenhengene rundt ulykken.

 
Mer info om NSB Stadler Flirt type 74

Jernbaneverket | Varslingstider ved ulykken i Vestfold NY

Statens Havarikommisjon for Transport | Pågående undersøkelse av jernbaneuly… NY

 

 
ENGLISH
 
           NSB’s new train sets Stadler Flirt – derailed during test run at Vestfold railway line in Norway. The train was running in about 100 kilometers an hour when the accident occured. One carriage has tipped in the derailment. One person was thrown out of the windshield, and is badly injured. Four others have been sent to hospital. There were only 5 people on board, two from the Norwegian State Railway company.
 
           The train was not in regular traffic when it derailed and struck the rock wall, but the normal traffic on the line is stopped until further notice. More info at nsb.no. All vehicles in the train set has been major damage. The train was in its final phase of the test run before it was put into operation at different distances, even where the accident occurred, in about two weeks from today. NSB have now decided to postpone the use of the new train sets until the cause of the crash is clared.
 
           Normally, the railway in Norway have a 70 kph limit. But not long from the accident site the track was upgraded in 2011 to be ready for the new trains, and a higher speed. Since both the train and the track is approved for one another and for the operation, it is now important to determine the cause of the incident. Spokesperson for the international department at train manufacturer Stadler said that they think a landslide is likely to have caused the derailment. The route where it all happened is a old railway line and is scheduled to close in about 4 years. Then the traffic will be moved to a upgraded line built 130 years ago.
 
           Latest information – The Norwegian National Rail Administration waited 15 minutes from the accident to the emergency services alert. Dispatcher center in Drammen was told about the train derailment involving personal injury at 10.30. Commuters were told via the message on the phone at 10:43, that stretch was closed due to an accident. The Rescue Coordination Centre for southern Norway was notified at 10:52. However, it is now confirmed that none of the injured, three Norwegians, one from Finland and one from Switzerland, was seriously injured. There was a voyage data recorder and video cameras on board. They will now be gone through to find the cause.
 
           In a press release from the Norwegian National Rail Administration is confirmed that the accident was notified immediately. Furthermore, it is proven that the locomotive ran straight ahead in a turn and hit the mountain. National Accident Commission for transportation in Norway writes in a report that the train was maintaining a speed of 135 km/h in a 70 zone. The train had just passed the 1,200-meter-long stretch where there are marked down from 130km/h to 70 km/h, with signs. When the brakes were installed, it took 11 seconds the train was at rest, 340 meters from braking.
 
DEUTCH
 
           NSBs neuen Triebzüge Stadler Flirt – entgleiste während der Prüfung bei Vestfold Bahnstrecke in Norwegen laufen. Der Zug wurde in etwa 100 Kilometer Laufen eine Stunde, als der Unfall aufgetreten. Ein Wagen wurde in der Entgleisung gekippt. Eine Person wurde aus der Windschutzscheibe geworfen und wird schwer verletzt. Vier weitere wurden ins Krankenhaus geschickt worden. Es waren nur fünf Personen an Bord, zwei von der norwegischen Staatsbahn.
 
           Der Zug war nicht im normalen Verkehr, wenn er entgleist und schlug den Felsen Wand, aber der normale Verkehr auf der Leitung wird bis auf weiteres gestoppt. Mehr Infos unter nsb.no. Alle Fahrzeuge im Zugverband hat große Schäden. Der Zug war in der Endphase des Testlaufs, bevor es in Betrieb in unterschiedlichen Abständen setzen, auch wenn der Unfall ereignet hat, in etwa zwei Wochen ab heute. NSB haben nun beschlossen, den Einsatz der neuen Züge zu verschieben, bis die Ursache des Absturzes ist erklärtes.
 
          Normalerweise haben die Eisenbahn in Norwegen einen 70 kmh Grenze. Aber nicht lange von der Unfallstelle wurde die Strecke im Jahr 2011 aufgerüstet, bereit zu sein für die neuen Züge, und eine höhere Geschwindigkeit. Da sowohl der Zug und die Strecke für einander und für den Betrieb genehmigt wird, ist es nun wichtig, die Ursache des Vorfalls zu ermitteln. Zug Herstellers Stadler sagte, dass sie glauben, ein Erdrutsch kann die Entgleisung verursacht haben. Sprecher der internationalen Abteilung bei Zug Herstellers Stadler sagte, dass sie denken, ein Erdrutsch ist wahrscheinlich verursachte die Entgleisung gewesen. Die Route, wo das alles passiert ist eine alte Bahnlinie und wird voraussichtlich in ca. 4 Jahren zu schließen. Dann wird der Verkehr wird zu einer Ausbaustrecke gebaut vor 130 Jahren bewegt werden.
 
           Aktuelle Informationen – Die norwegische National Rail Administration wartete 15 Minuten von dem Unfall bei den Notdiensten Alarm. Dispatcher-Zentrum in Drammen wurde über die Zugentgleisung mit Personenschaden um 10.30 Uhr erzählt. Pendler über die Nachricht am Telefon wurden um 10:43 erzählte, war, dass Stretch geschlossen wegen eines Unfalls. Das Rescue Coordination Centre für Süd-Norwegen wurde um 10:52 benachrichtigt. Jedoch ist es nun bestätigt, dass keiner der Verletzten, drei Norweger, ein aus Finnland und einer aus der Schweiz, ernsthaft verletzt wurde. Es gab einen Schiffsdatenschreiber, und Videokameras an Bord. Sie werden nun durchlaufen werden, um die Ursache zu finden.Es gab einen Schiffsdatenschreiber, und Videokameras an Bord. Sie werden nun durchlaufen werden, um die Ursache zu finden.
 
           In einer Pressemitteilung vom norwegischen National Rail Administration bestätigt wird, dass der Unfall sofort gemeldet wurde. Darüber hinaus wird gezeigt, dass die Lok geradeaus lief in einer Kurve und schlug auf den Berg. Unfallversicherungsanstalt Kommission für den Transport in Norwegen, schreibt in einem Bericht, dass der Zug wurde die Aufrechterhaltung einer Geschwindigkeit von 135 km/h in einer 70 Zone. Der Zug hatte gerade die 1200 Meter lange Strecke geleitet, wo es nach unten ab 130km/h auf 70 km/h markiert sind, mit Schildern. Wenn die Bremsen installiert wurden, dauerte es 11 Sekunden war der Zug in Ruhe, 340 Meter vom Bremsen.

BT | Tog sporet av – flere skadet
Dagbladet | Tog sporet av og traff fjellvegg
VG | Flere skadet i avsporing med NSBs nye supertog
TV2 | Togulykke i Vestfold – Flere skadet etter avsporing
NRK Østafjells | Skadd etter togavsporing på Vestfoldbanen
Aftenposten | Tog sporet av på Vestfoldbanen – flere personer skadet

Int
Ilta Sanomat | Junan testiajo meni pahasti pieleen Norjassa (suomi)
Schweizer Fernsehen | Stadler-Rail-Testzug entgleist – 5 Verletzte (swiss)
Vorarlberg Online | Norwegen: Schweizer Zug entgleist während Testfahrt (österreich)
Blick.ch | Bei Testfahrt Schweizer verletzt – Spuhler-Zug entgleist in Norwegen (swiss)
The Local | Norways news in english – High-speed test train derails in Norway (english)
Blick.ch | Hier werden die Verletzten geborgen – Spuhler-Testzug völlig zerstört (swiss)
 
( mer… more… mehr… )

Trykk her for statistikk over besøkende | Trykk her for annonserings- og reklamemuligheter                                                       

   
FØLG NETTSIDEN PÅ FACEBOOK
 
FØLG MEG PÅ TWITTER!       (NOR)
 
FØLG MEG PÅ TWITTER!       (ENG)
  FOLLOW MY PAGE ON FACEBOOK FOLLOW ME ON TWITTER!    (NOR) FOLLOW ME ON TWITTER!    (ENG)
  FOLGEN MEINE SEITE AUF FB FOLGEN SIE MIR AUF TW!    (NOR) FOLGEN SIE MIR AUF TW!    (ENG)
 
 
 

 
SISTE BESØKENDE  
LAST VISITORS  
LETZTE BESUCHER  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
        Design: ɈК 0rvik © 2009